Shanghai Electric Powers Trial Operations for China's First Digital Rail-guided Tram Equipped with iDRT System
PR87862
SHANGHAI, Feb. 1, 2021 /PRNewswire=KYODO JBN/ --
Trial operations officially commenced for the Shanghai Pilot Free Trade Zone T1
Demonstration Line in the Lin-gang New Area. As one of the companies involved
in the construction of the T1 Demonstration Line, Shanghai Electric Automation
Group, a member of Shanghai Electric Group Company Limited, developed China's
first intelligent digital-rail transport system ("iDRT") for the digital
rail-guided rubber-tired tram ("DRT") used on the line. Shanghai Electric
supplied the digital track, operation management system, network communications
system, communications backbone, intelligent platform system and control center
for the demonstration line; as well as managing the supply, installation and
other services related to electromechanical systems.
https://mma.prnewswire.com/media/1429402/video_1.mp4
The T1 Demonstration Line spans nine stations across a total length of 21.7
kilometers, and is expected to be fully operational to the public by June this
year. The vehicle is China's first to adopt the DRT system, a world-leading
technology that uses sensors on the tram to collect information from magnetic
markers on the road's surface, guide the vehicle's position in real-time, and
control the direction of the rubber tires as the vehicle moves. In a
significant leap forward for green transportation in the Lin-gang New Area, the
T1 Demonstration Line will commence operations on pure electric power while
hydrogen refueling stations are being constructed, with plans to fully switch
to hydrogen power once applicable.
The demonstration line uses world-leading magnetic nail navigation and
under-vehicle sensor technology, which boasts a short construction period and
less road surface occupation, while also delivering significant energy savings
and emission reductions. The DRT requires just half the construction investment
for traditional trams, meeting the ambition of the Lin-gang New Area to create
a green, intelligent and extensive transportation ecosystem.
At the core of the T1 Demonstration Line is a new lightweight, intelligent
medium-capacity digital-rail transit system that uses magnetic markers as
virtual tram tracks, leverages autonomous digital rail-guided rubber tire trams
as vehicles, and adopts modern tram operation control methods. The operation
control and management system boasts automatic tracking, auxiliary operations
and safety as its main features, powered by high-precision sensor positioning
technology, centralized control technology, and intelligent transportation
management technology.
As a result, the iDRT can control the operation of the tram along the digital
track with world-leading precision, and drive autonomously under independent
right-of-way conditions. The vehicle is able to adjust its speed, avoid
barriers and perform other operations to ensure safety, regardless of the
weather. Meanwhile, drivers receive comprehensive information regarding target
speed, stops and track deviation. With the combination of low cost and flexible
operations, this groundbreaking transit system can be run using existing roads
in cities – saving the trouble of building fixed rails and making it the ideal
choice for urban transportation.
Following extensive development and testing, the iDRT has now entered the
promotion and application demonstration stage. The T1 Demonstration Line is a
valuable platform to demonstrate the commercial applications of the iDRT
system, while facilitating iterative updates of existing technologies and
products throughout the process. These tests will lay the groundwork for future
promotions of the system in domestic and international markets.
The commercial applications of the DRT equipped with iDRT in the Lin-gang New
Area will further advance the research and development of Shanghai's digital
tram standards. At the same time, the launch of the T1 Demonstration Line will
promote the coordinated development and intelligent maintenance of iDRT
systems, as well as the adoption of the system in other self-driving
demonstration lines.
SOURCE Shanghai Electric
本プレスリリースは発表元が入力した原稿をそのまま掲載しております。また、プレスリリースへのお問い合わせは発表元に直接お願いいたします。
このプレスリリースには、報道機関向けの情報があります。
プレス会員登録を行うと、広報担当者の連絡先や、イベント・記者会見の情報など、報道機関だけに公開する情報が閲覧できるようになります。