Daiwa House Finalizes Outline of DMLP Phase I -- 2, Large-scale Multi-tenancy Logistics Facility...

DAIWA HOUSE

OSAKA, Japan, Oct. 31, 2017 /Kyodo JBN/ --

Daiwa House Industry Co., Ltd.

Daiwa House Finalizes Outline of DMLP Phase I -- 2, Large-scale Multi-tenancy Logistics Facility, in Indonesia

An outline has been finalized for PT Daiwa Manunggal Logistik Properti, a joint venture between Daiwa House Industry Co., Ltd., and PT Bekasi Fajar Industrial Estate Tbk. (BEST), which is involved in the development and infrastructure of industrial estates in Indonesia. In line with this, work commenced on DMLP Phase I -- 2, a large-scale multi-tenancy logistics facility, in Bekasi, West Java, Indonesia, on October 2, 2017.

Image: https://prw.kyodonews.jp/prwfile/release/M000427/201710317370/_prw_PI1fl_1vaO8AY6.jpg

Daiwa House Industry participated in the planning of MM2100 Industrial Estate, an industrial estate business that was developed by BEST in Bekasi in February 2013. The company began to develop that area as Daiwa Manunggal MM2100 Industrial Estate (with a total development area of about 1,450 ha (*1)). It also managed the development of DMLP Phase I -- 1, Indonesia’s first multi-tenancy logistics facility. The logistics facility (*2) was equipped with freezing and chilling capabilities for cold chain (*3) storage and factory rental space, which was limited in Indonesia. On this occasion, the company began work on DMLP Phase I -- 2, which is the second stage of its multi-tenancy logistics facility in Indonesia, on October 2, 2017.

In the future, Daiwa House Industry will combine the managerial resources its group possesses, including its knowledge of building surveying, designing and construction as well as building management and administration. It is making efforts to attract businesses from Japan and around the world which are considering logistics facilities overseas, and plans to expand the development of logistics facilities to meet the needs of clients.

(*1) Including the planned site.

(*2) The company attracted Kawanishi Warehouse Co., Ltd. to the industrial estate, carried out designing and construction, and handed it over in September 2017.

(*3) To transport fresh, frozen or other foods from a producing area to a consumption area at temperatures that are kept consistently low.

Main points

1. Development of a logistics facility in Indonesia, where demand for product distribution is rising

2. Development of a multi-tenancy logistics facility capable of accommodating up to eight tenants

For details, please visit

https://prw.kyodonews.jp/prwfile/release/M000427/201710317370/_prw_PR1fl_5Xi1h93W.pdf

本プレスリリースは発表元が入力した原稿をそのまま掲載しております。また、プレスリリースへのお問い合わせは発表元に直接お願いいたします。

プレスリリース添付画像

DMLP Phase I - 1, 2

| Small | Normal |
| Original |

このプレスリリースには、報道機関向けの情報があります。

プレス会員登録を行うと、広報担当者の連絡先や、イベント・記者会見の情報など、報道機関だけに公開する情報が閲覧できるようになります。

プレスリリース受信に関するご案内

このプレスリリースを配信した企業・団体

  • ※購読している企業の確認や削除はWebプッシュ通知設定画面で行なってください
  • SNSでも最新のプレスリリース情報をいち早く配信中