ENOC opens Service Station of the Future at Expo 2020 Dubai
PR88181
DUBAI, UAE, Feb. 23, 2021 /PRNewswire=KYODO JBN/ --
ENOC Group, the Official Integrated Energy Partner of Expo 2020 Dubai, unveiled
its innovatively designed Service Station of the Future, located at the Expo
2020 site.
In addition to supporting the logistical needs of Expo 2020's fleet ahead of
the global event, it will serve the public at District 2020, the smart
human-centric community that will become Expo's physical legacy after the event
concludes on 31 March 2022.
The station is the world's first LEED Platinum certified and the region's first
to incorporate on-grid wind turbine for power generation and carbon fibre in
the construction of its canopy, with the design inspired by the ghaf, UAE's
national tree.
Over 43,000m2/37 tonnes of carbon fibre have been used to build the 133
multi-layer canopy frame. The leaf-shaped ethylene tetrafluoroethylene cushion
canopy is 100 per cent UV ray-protected and corrosion-proof, and illuminated
with more than 3,800 LED light modules. The nine tree designs that support the
station were built from another 22,500m2 of carbon fibre. Some 283 solar
photovoltaic panels generate 143 MWh of solar power per year and a 25-metre
wind turbine produce 12.7 MWh of wind energy annually.
Highlighting the group's aspirations to 'Reimagine Energy', HE Saif Humaid Al
Falasi, Group CEO, ENOC, said: "Our role as Official Integrated Energy Partner
for Expo 2020 Dubai provides us the opportunity to showcase our industry and
country on the global stage. The station further underlines our participation
at the event. The first-of-its-kind in the world which harnesses the power of
renewables, it heralds a new era in fuel retail."
The station uses carbon filtration technologies to recycle grey water for
irrigation, and has drinkable air units with ozonation techniques to convert
water molecules from the air to drinkable water for staff. Machine learning,
artificial intelligence and data analytics customise retail offerings, managing
queue and waiting times at the forecourt, and improving the customer journey.
Vehicle mapping surface lighting direct vehicles to the fuelling area, as well
as entry and exits. Over 12 million LED chips illuminate the digital screens.
For enhanced safety, the station uses advanced fuel management and gauging
systems, providing 24-hour leak detection.
ENOC recorded 400,000 manhours during the build process, with zero lost time
injury, demonstrating its commitment to adhering to best practices in health,
safety and environment.
Photo:
https://mma.prnewswire.com/media/1442116/ENOC_Service_Station_of_the_Future.jpg
Contact:
Srishti Soni
srishti.soni@bcw-global.com
+971 506473920
SOURCE: ENOC Group
本プレスリリースは発表元が入力した原稿をそのまま掲載しております。また、プレスリリースへのお問い合わせは発表元に直接お願いいたします。
このプレスリリースには、報道機関向けの情報があります。
プレス会員登録を行うと、広報担当者の連絡先や、イベント・記者会見の情報など、報道機関だけに公開する情報が閲覧できるようになります。