Sinopec Fuling Shale Gas Field Sets New Cumulative Production Record of 40 Billion Cubic Meters

SINOPEC

PR92213

 

BEIJING, Oct. 9, 2021 /PRNewswire=KYODO JBN/--

 

China Petroleum & Chemical Corporation's (HKG: 0386, "Sinopec") Fuling Shale

Gas Field – the first commercially developed and operated large-scale shale gas

field in China – announced on October 8 that it has produced 40 billion cubic

meters of shale gas, setting a new record for the cumulative production of

shale gas in the country. The steady supply of a green gas source has benefited

more than 200 million residents in over 70 cities across six provinces along

the Yangtze River Economic Belt.

 

Shale gas is an unconventional natural gas that exists in the organic-rich mud

shale and its interlayers in an adsorbed or free state. The main component of

shale gas is methane, a clean, efficient energy resource and industrial

chemical, widely used in residential gas, urban heat supply, power generation,

automobile fuel and chemical production.

 

Sinopec's Fuling Shale Gas Field has a daily gas production reaching 20 million

cubic meters at present and can meet the gas demands of 40 million households,

contributing to a speedy clean energy transition, ensuring national energy

security and helping to achieve the goals of reaching peak carbon and carbon

neutrality.

 

The Fuling Shale Gas Field is located in the Fuling District of Chongqing City

and is one of the key gas sources of China's Sichuan-East Gas Pipeline and a

foundation of Sinopec's promotion of gas popularization in the Yangtze River

Economic Belt. The construction of the gas field began in December 2012 and at

the time it was the world's first major commercial shale gas discovery outside

North America. The project entered commercial development ahead of schedule in

March 2014 and became China's first large-scale shale gas field with commercial

development. It also made China the third country worldwide to achieve shale

gas commercial development after the United States and Canada.

 

The gas field went into operation in 2017 as scheduled with an annual

production capacity of 10 billion cubic meters, reducing carbon dioxide

emissions by 12 million tons per year, which is the equivalent of planting 110

million trees or taking 8 million cars off the roads. The successful

development of the Fuling Shale Gas Field has set a new milestone in China's

energy development history and opened a new chapter for the country's energy

revolution.

 

Innovative management model enabling "Chinese speed" for shale gas development

 

Sinopec Jianghan Oilfield Company benchmarked world-class standards to optimize

production organization and operation as well as standardized construction,

significantly accelerating and improving productivity and construction of the

gas field to build a shale gas production capacity of 10 billion cubic meters

in only three years. It became China's first large-scale shale gas field to

reach 10 billion cubic meters, enabling the "Chinese speed" that has turned

heads around the world.

 

Now, the construction period of drilling and fracturing has been cut in half.

The Jiaoye 1HF discovery well of the gas field has been in continuous

production for more than 3,000 days. Another well, the Jiaoye 6-2HF, has

produced more than 330 million cubic meters of gas as it maintains two records

for the longest development time of domestic shale gas wells and highest single

well cumulative production.

 

According to an assessment by China's Ministry of Natural Resources in October

2020, the proven total reserves of the shale gas field in Fuling have reached

792.641 billion cubic meters.

 

Starting from scratch, Sinopec has been continuously exploring, fracturing, and

has integrated five technology systems of shale gas development including the

staged fracturing gas testing of long horizontal wells and green development,

laying a solid theoretical and technical foundation for China's large-scale

shale gas exploration and development.

 

In November 2014, Sinopec was granted the "International Pioneer Award" by the

5th World Shale Oil & Gas Summit for the discovery of Fuling Shale Gas Field.

In 2018, the "Efficient Exploration and Development of Fuling Large-scale

Marine Shale Gas Field" project won the first prize in the National Science and

Technology Progress Awards.

 

For more information, please visit Sinopec (Innovative management model

enabling "Chinese speed" for shale gas development

 

SOURCE: SINOPEC

 

Image Attachments Links:

 

   Link: http://asianetnews.net/view-attachment?attach-id=403414

 

   Caption: Sinopec Fuling Shale Gas Field Sets New Cumulative Production Record of 40

Billion Cubic Meters.

本プレスリリースは発表元が入力した原稿をそのまま掲載しております。また、プレスリリースへのお問い合わせは発表元に直接お願いいたします。

このプレスリリースには、報道機関向けの情報があります。

プレス会員登録を行うと、広報担当者の連絡先や、イベント・記者会見の情報など、報道機関だけに公開する情報が閲覧できるようになります。

プレスリリース受信に関するご案内

SNSでも最新のプレスリリース情報をいち早く配信中